
Kuldeep Rawat
Badrinath highway opens pole of local administration’s air claims
Today on Tuesday, it has been 6 days, the claims of the government and the administration are revealing the claims of Badrinath’s movement in these 6 days only for the movement of vehicles for only 2 to two and a half hours on Monday, barely this route could be realized. Due to lack of road, this road has been closed again due to the slipping of the rock, along with this, due to the bad weather, the highway is facing difficulties in the opening. About 800 pilgrims are stranded, who have been stopped at Pandukeshwar, if the weather supports, the highway will be smooth by this evening.
Discover more from Lokjan Today
Subscribe to get the latest posts sent to your email.
